Common pitfalls

How to Avoid Common Pitfalls with Pre-Engineered Buildings

Have you at some point asked what makes some pre-engineered buildings (PEBs) go up almost easily while others fall into delay, budget overruns, or unexpected construction issues? The key is not in the materials at all, but in how well you plan, coordinate, and execute each phase of the project.

Pre-engineered buildings have transformed the construction field with quick assembly, cost efficiency, and design flexibility. Though we see these great benefits, the process does have its issues. From site evaluation, which is the initial step, to final assembly, which is the endpoint, we see that one mistake can cause a chain reaction of problems.

In this blog, we go over the primary issues in pre-engineered building projects, which we also present solutions for. Also, we will be talking about how, by working with Metfraa Steel Buildings, you can easily overcome these issues.

What Exactly Are Pre-Engineered Buildings?

Pre-assembled structures, also referred to as prefab or modular steel buildings, are a type of pre-designed steel framework that is manufactured in a factory and assembled on-site. We do away with the need for on-site welding or cutting of steel beams, which instead we have ready-made components like columns, beams, girts, and panels, which are tailored to the specific requirements of each project.

This approach offers clear advantages: What we present has many benefits:

  •  Speed: Reduced construction times for our projects, which outpace traditional buildings.
  •  Predictable Costs: Factory production reduces cost unpredictabilities.
  • Design Flexibility: Custom, where you choose layouts, roof lines, and design elements.
  •  Consistent Quality: Exact crafting in a controlled setting.

But although we see the benefits, poor planning or oversight, which is a very easy thing to do, can put a project off track. Let’s look at what these are and how to avoid them.

Top Issues in Pre-Engineered Buildings (and What to Do About Them)

1. Skipping Thorough Site Assessment

Mistake: Jumping into design before site evaluation.

Problem: Unreliable soil, drainage issues, or unforeseen wind forces may put structural integrity at risk.

Solution: Start out with a geotech report. At Metfraa Steel Buildings, we perform in-depth soil analysis, wind load study, and research into local climate, which we use to design your structure for what the real world will throw at it. This step is to avoid future issues like foundation settlement or wind-induced stress.

2. Lack of early communication with project stakeholders

Mistake: At the beginning of the process, not including all key players, architects, engineers, suppliers, and contractors.

Problem: Misaligned goals cross-purpose requirements, which in turn cause delays and cost overruns.

Solution: In the Metfraa Steel Building, we implement a kickoff workshop that brings together all stakeholders. From the get-go, we promote collaborative planning, which includes the design team and the construction crew, all of which we see as integral in achieving the same end goal.

3. After design changes have already been implemented

Mistake: Request for changes in design after fabrication.

Problem: At this point, changes lead to rework, increased costs, and project delays.

Solution: Finalize the E-sign before fabrication, which is the best practice. Use 3D modeling and BIM tools to identify issues early out in the design phase, for instance, before HVAC ducts end up over the steel beams. At Metfraa Steel Buildings, we integrate the latest in BIM software to model real-world issues, thus when you see it on paper, you can be confident that it is what will be delivered at the site.

4. Neglecting Quality Control in the Manufacturing Process

Mistake: Assuming all put-together parts are to spec.

Problem: Poor quality steel, defective welds, or insufficient corrosion protection may ruin durability.

Solution: At Metfraa Steel Buildings, we perform in-depth QA/QC measures, which include sending out mill tests, weld inspections, and surface treatment analysis. We also do nondestructive testing (NDT) for weld integrity, and we apply galvanizing or primer, which in turn protects against corrosion and increases the life of the building.

5. Poor Logistics and Delivery Planning

Mistake: Overseeing delivery coordination and site access.

Problem: Mislabeled bundles, delayed shipments, or restricted access, which bring work to a standstill.

Solution: Coordinate our delivery schedules. At Metfraa Steel Buildings, we tag and ship each component set according to the assembly sequence, which in turn makes site assembly a smooth and efficient process. Also, we plan for site-specific issues like narrow access roads or overhead clearance issues.

6. Underestimating Erection Safety and Skills

Mistake: Hiring green hand crews or cutting safety corners.

Problem: Assembly errors may cause structural instability or, at worst, an accident.

Solution: Train and deploy experienced erection teams that follow industry best safety practices. At Metfraa Steel Building, we provide site supervision which is to ensure correct bolting, welding, and bracing that in turn meet or exceed international standards.

Pro Tips for Running a Smooth PEB Project

Here is a list of things you can do to avoid costly mistakes:

  • Start with a Detailed Site Study: Soil analysis, wind load studies, and drainage designs.
  •  Involve All Key Players Early: Architects, builders, contractors, and vendors.
  • Use BIM and 3D Visualization: Identify issues and sort out the details first.
  •  Enforce Strict Quality Control: Request certifications and 3rd party inspections.
  •  Plan Deliveries and Logistics: Label groups, coordinate between sites, and set achievable timelines.
  • Prioritize Safety and Experience: Work with proven erection teams that have in-depth knowledge of steel construction.

Why Choose Metfraa Steel Buildings?

Metfraa Steel Buildings has extensive experience in pre-engineered steel building projects. From the initial design concept to the final erection, we integrate into our process the best-in-class technology like 3D modeling and BIM, and also very strict quality assurance, which we do to present to you structures that will stand the test of time.

Our team is at your side. We do in-depth site studies, we optimize fabrication, and we see to it that your project is safe and efficient. We are in charge of getting your project in on time, on budget, and to the highest industry standards.

Conclusion

A preassembled building is reported to have speed, cost savings, and design flexibility. That said, we see how easy it is to run into issues, which in turn cause delays and unexpected costs with pre-engineered buildings. By being proactive in site studies, BIM modeling, quality assurance, and communication, you may put your project in the best possible position.

Ready to grow your business with smarter solutions that also save you money? At Metfraa Steel Building, we can offer you a free consultation, which is the start of our pre-engineered building process. We will guide you every step of the way for an efficient, safe, and budget-friendly experience.

Contact us today to get started and see how we can turn your vision into reality